Mains Risk Prioritisation System (MRPS) surveys

SGN

RPS was appointed to carry out Mains Risk Prioritisation System (MRPS) surveys.

MRPS surveys have a significant role in gathering data that is used to set the replacement criteria that will see the removal of all metallic gas mains that lie close to residential or industrial properties. These surveys ultimately assist in reducing accidents and incidents occurring from the gas networks.

SGN required RPS to carry out a survey of specific pipes within the gas supply network in order to provide them with a complete set of documentation, including updated plans and pipe information. This allowed SGN to identify which metallic gas mains needed to be replaced.